01625 540 101

Posts by pmsupport

Commercial – Joy Global, Bolton

Joy Global Cgi

Brand new head office facility for multi-national organisation Development incorporating centralised manufacturing base Head Office suites, administration functions, meeting rooms, etc. Staff welfare & catering facilities for both manufacturing complex and head office.

Read More

Office – St Helens Council, Atlas House, St Helens

Placeholder

New build low rise office development within the heart of St Helens VRF heat pump technology, with mixed mode ventilation, incorporating passive intake system and automatically openable windows to incorporate the natural ventilation into the VRF system. All lighting systems have occupancy sensing and daylight sensing to external perimeter zones. All office areas have accessible…

Read More

Office – Manchester Science Park HUB, Manchester

Placeholder

New build low rise office development within the heart of Manchester Science Park Internal street-scape, with café bar, meeting space, performance areas and full height glazed atrium. Low energy building, utilising thermal mass, incorporating options for natural ventilation within the atrium & tenants fit-out areas. High speed resilient infrastructure, providing flexibility of use (from clinical…

Read More

Hotel – Crowne Plaza/Staybridge Suites, Oxford Road, Manchester

Placeholder

Low energy building, with close occupancy control Mist sprinkler system installed Firefighting facilities for high rise developments Fully balanced central supply and extract system for the bedrooms and suites. Linked to the Manchester Business School in which CE2 designed the M&E installations and compliance with Manchester University standards

Read More

Hotel – Hilton, Southampton (Aedis Bowl)

Placeholder

175 bed new build hotel, incorporating conference facilities and spectator facilities for the adjacent Southampton Cricket Ground All new restaurant, viewing and Sky broadcasting facilities integrated into the hotel operation Reconfiguration & upgrade of site-wide incoming services & integration with the cricket ground. Development undertaken whilst maintaining the operation of the cricket ground, including early…

Read More

Hotel – Warner, Studley Castle, Stratford-upon-Avon

Placeholder

Refurbishment of grade II* listed castle and adjoining new build 188 bedroom hotel, large cabaret area (for live performances), full restaurant, bar, side bars, retail outlet, coffee shop, etc. Refurbishment and extension of grade II listed stable block to form swimming pool, spa, bistro and treatment rooms. Hybrid HVRF Air conditioning to minimise capital and…

Read More

Student Accommodation – St Aldates, Oxford

Placeholder

Combined Oxford College student accommodation and private operator student accommodation 5 storey redevelopment of existing Grade II listed office and retail accommodation within Oxford City conservation area. 133 student apartments, communal areas, and 4 commercial/retail shell units. Listed façade retained. Low running costs an essential Client requirement, together with very high specification IT infrastructure linked…

Read More

Apartment – Oxygen Towers, Store Street, Manchester

Placeholder

3 towers; 9 stories, 16 stories and 32 stories including 18 town houses at ground floor level all separately serviced Underground car park, concierge, mid-level swimming pool & fitness suite, roof top terrace (bar & dining) and allotments for residents’ use. High Specification penthouse apartments Building sprinkler system (to each apartment) Communal heating system from…

Read More

Apartment – Leftbank Buildings, Birmingham

Placeholder

2 individual High-rise buildings; 23 storey & 32 storey in Birmingham city centre Independent pre-let serviced retail units at ground floor Servicing strategies for each apartment & each unit are completely separate to maximise flexibility & value. Sprinkler systems to each apartment, smoke ventilation & pressurisation as part of the overall Fire Engineered solution. Agreed…

Read More